OEM / ODM · MOQ 2,000 pcs per style · Quoted FOB · 20 Years Manufacturing

YYUEOUlaptopbagfactory.com

Process Transparency

The document package behind every order

Ask five factories what paperwork you will actually receive and you will get five vague answers. Here is our complete list — stage by stage — before you spend a cent.

Stage 1 · Quotation

  • Line-item FOB quotation (tiered unit pricing)
  • Material & construction map per panel group
  • Lead-time band + carton-load plan
  • Mutual NDA (applies by default from first contact)

Stage 2 · Sampling

  • Virtual sample set (logo on real constructions)
  • Sample proforma invoice (fee credited at MOQ)
  • Tech-pack confirmation with tolerance tables

Stage 3 · Order confirmation

  • Proforma invoice with payment schedule (T/T 30/70 or L/C terms)
  • Lot assignment record (fabric & trim traceability)
  • Production slot confirmation with key dates

Stage 4 · Production

  • Pre-production approval sheet (signed golden sample reference)
  • Incoming fabric inspection record (4-point grading)
  • Inline checkpoint sheets — hourly, per sewing line

Stage 5 · Inspection & shipment

  • AQL final inspection report with defect classification
  • Third-party inspection access (SGS / BV / TÜV / your QA — scheduled on request)
  • Packing list with carton specifications & shipping marks
  • Commercial invoice · B/L copy for balance settlement
  • Destination-market compliance labeling documentation (US CPSIA / EU REACH-oriented, as applicable)
Every document above is issued as a matter of process — not on request, not for an extra fee. If a supplier hesitates to commit any item on this list in writing, you have learned something important before the deposit. Cross-reference with the 45-day order journey (when each document arrives) and the quality standards (what the inspection numbers mean).
Get My FOB Quote →